General Program
The General Program/Technical Session is comprised of papers that were voted on and selected from the Technical Subcommittees that were deemed to be relevant to everyone in PCIC. The paper presentations are presided over by the PCIC Executive Subcommittee officers:
- Paul Sullivan - PCIC Chair
- Robert Durham - PCIC Vice Chair
- Richard Paes - PCIC Secretary
GENERAL TECHNICAL SESSION I
Monday, September 21, 2026 - 8:00am to 11:15am - Salons F & G
Presiding: Dr. Robert Durham, PCIC Vice Chair
Monday, September 21, 2026 - 8:00am to 11:15am - Salons F & G
Presiding: Dr. Robert Durham, PCIC Vice Chair
PCIC-2026-01 INTRODUCTION OF THE IEEE P2969 GUIDE FOR CONTINUOUS THERMAL MONITORING OF SWITCHGEAR & MOTOR CONTROL CENTERS UP TO 52KV
Peter Baen Exetherm by Eaton
Shelly DeGrate Grace Technologies
Tom Malone MMT Services
Marcelo Valdes ABB
PCIC-2026-02 API 541 6TH EDITION WHAT IS NEW AND IMPROVED FROM THE TEAM BEHIND THE REVISION
Wayne Paschall ABB
Thomas Bagley WEG
Dennis Bogh IPS
Mark Metzdorf BP
PCIC-2026-03 HOLISTIC APPROACH TO ELECTRICAL EQUIPMENT MONITORING & DIAGNOSTICS AND HOW THAT TIES IN WITH NFPA 70B
Mateusz Sadlon Schneider Electric USA
Alfredo Arriola-Gutierrez Schneider Electric USA
Melvin Lee Perry, Jr BASF Corporation
Peter Baen Exetherm by Eaton
Shelly DeGrate Grace Technologies
Tom Malone MMT Services
Marcelo Valdes ABB
PCIC-2026-02 API 541 6TH EDITION WHAT IS NEW AND IMPROVED FROM THE TEAM BEHIND THE REVISION
Wayne Paschall ABB
Thomas Bagley WEG
Dennis Bogh IPS
Mark Metzdorf BP
PCIC-2026-03 HOLISTIC APPROACH TO ELECTRICAL EQUIPMENT MONITORING & DIAGNOSTICS AND HOW THAT TIES IN WITH NFPA 70B
Mateusz Sadlon Schneider Electric USA
Alfredo Arriola-Gutierrez Schneider Electric USA
Melvin Lee Perry, Jr BASF Corporation
GENERAL TECHNICAL SESSION II
Monday, September 21, 2026 - 2:00pm to 5:00pm - Salon G
Presiding: Richard Paes, PCIC Secretary
Monday, September 21, 2026 - 2:00pm to 5:00pm - Salon G
Presiding: Richard Paes, PCIC Secretary
PCIC-2026-04 IEEE GUIDE AND CHECKLISTS FOR DATA COLLECTIONS FOR PERFORMING AN ARC-FLASH HAZARD CALCULATION STUDY FOR SYSTEMS OPERATING AT THREE-PHASE 50/60 HZ AC 1000 V AND BELOW.
Daleep Mohla DCM Electrical Consulting Services
Daryld Ray Crow DRC Consulting Services
Walter Gonzalez ETAP
Albert Marroquin ETAP
Antony Parsons Eaton
PCIC-2026-05 SEAMLESS TRANSITION: MIGRATING AN OPERATING OIL REFINERY TO A NEW ELECTRIC UTILITY WITHOUT PARALLELING SYSTEMS, EMPLOYING ISLANDED SYSTEM OPERATION
Karl Dias Marathon Petroleum
David Alley ANNA Inc.
Byron Broussard Turbomachinery Controls
Ole Haaland ANNA Inc.
PCIC-2026-06 RELIABILITY ASSESSMENT AND EARLY FAILURE OF LARGE SYNCHRONOUS MOTOR
Merisha Bily Shell Canada
Radu Udrescu Qualitrol Corp
Saeed Ui Haq GE Verona
Chris Schartner GE Verona
Daleep Mohla DCM Electrical Consulting Services
Daryld Ray Crow DRC Consulting Services
Walter Gonzalez ETAP
Albert Marroquin ETAP
Antony Parsons Eaton
PCIC-2026-05 SEAMLESS TRANSITION: MIGRATING AN OPERATING OIL REFINERY TO A NEW ELECTRIC UTILITY WITHOUT PARALLELING SYSTEMS, EMPLOYING ISLANDED SYSTEM OPERATION
Karl Dias Marathon Petroleum
David Alley ANNA Inc.
Byron Broussard Turbomachinery Controls
Ole Haaland ANNA Inc.
PCIC-2026-06 RELIABILITY ASSESSMENT AND EARLY FAILURE OF LARGE SYNCHRONOUS MOTOR
Merisha Bily Shell Canada
Radu Udrescu Qualitrol Corp
Saeed Ui Haq GE Verona
Chris Schartner GE Verona